Negotiation builds a team as well as a set of requirements.
BARRY BOEHMSoftware engineering economics.
More Barry Boehm Quotes
-
-
Stop the life cycle-I want to get off!
BARRY BOEHM -
About 90 percent of the downtime comes from, at most, 10 percent of the defects.
BARRY BOEHM -
Agile methods derive much of their agility by relying on the tacit knowledge embodied in the team, rather than writing the knowleadge down in plans.
BARRY BOEHM -
If a project has not achieved a system architecture, including its rationale, the project should not proceed to full-scale system development. Specifying the architecture as a deliverable enables its use throughout the development and maintenance process.
BARRY BOEHM -
Poor management can increase software costs more rapidly than any other factor.
BARRY BOEHM -
Software engineering economics.
BARRY BOEHM -
Poor management can increase software costs more rapidly than any other factor. Particularly on large projects, each of the following mismanagement actions has often been responsible for doubling software development costs.
BARRY BOEHM